Table of Contents

Executive Summary

Chapter 1. Introduction

1.1.  Project Rationale

1.2.  Overview of GreenPlan-IT Toolkit

1.3.  GreenPlan-IT Toolkit Application Process

Chapter 2. Case Study: City of San Mateo

2.1 Project setting

2.2 Data layers collected and used for locator tool

2.3  Site Locator tool setup

2.4 Results Analysis

Chapter 3. Case Study: San Jose Priority Development Area

3.1  Project Setting

3.2  GIS Site Locator Tool

  • Data layers collected and used
  • Site Locator tool setup
  • Results Analysis
    • Ranking of sites
    • Expected/desired final product
    • Final steps to get all results to 100% (maps)

3.3  Modeling Tool

3.3.1        Data Collection

3.3.2        Model Setup

3.3.3        Model Calibration

3.3.4        Baseline Condition

3.4  Optimization Tool

3.4.1        Focus Area

3.4.2        Optimization Problem Formulation

3.4.3        Design Storm

3.4.4        GI Representation

3.4.5        GI Cost

3.4.6        Optimization Results

3.4.7 Sensitivity Analysis

Chapter 4. Discussion and Recommendations

4.1  Lessons learned

4.2  Data Gaps

4.3  Future steps/enhancement

Chapter 5. References